Gas-ROW Permit Requirements

Follow the steps below to apply for a Right-of-Way (ROW) permit for gas infrastructure in Lagos State.

Requirements for Permit

  • Application Letter to include Proposed routes, Routes diagram, Distance to be covered. Letter must be addressed to the General Manager, LAGOS STATE INFRASTRUCTURE MAINTENANCE & REGULATORY AGENCY.
  • List of all proposed routes
  • Site assessment report
  • Occupational Health & Safety plan
  • Proof of application payment

Permit Fees

Activity Amount (₦)
Application Fee 50,000.00
Optic Fibre Cable 15,000.00 per metre
Administrative & Project Management 15% of permit fees

Reinstatement Rates

Category Amount (₦/m)
Asphalt 14,000.00
Concrete 12,000.00
Lawn 5,000.00
Paving Stone 10,000.00
Integrity Test NIL

Permits Issued – Right of Way (Gas)

List of currently issued permits for utility infrastructure using Right of Way.

Date Company Site Address Type Height / Distance
2 Oct 2024 GASLINK Micheal Oluwole Cole Street, Olowora/Micheal Odutola, Ibadan Expressway/Red BRT Park, Expressway Isheri/Ogunusiroad Isheri Ojodu/ Ibadan Expressway, Beside ENYO Filling Station, Ogun State 2,279.40
6 Nov 2024 GASLINK Lagos High Court by Old Secretariat, Oba Akinjobi Way, Oba Aladejobi Street, Ikeja Lagos. 704
12 Nov 2024 GASLINK Alhaji Wasiu Ogunlana Road, Ago Palace Way, Amuwo Odofin. 780.1